TO BUILD SOMETHING OF VALUE IS OUR GREATEST DREAM

"Since our childhood, we’ve always dreamt of building great things. Projects, homes, offices, companies and more."

"We are not merely transforming land into blocks and bricks. We believe in the beauty of creation and the power of design. And more importantly, we believe in the realization of your dreams."

At Samruddhi, We help you transform your Building design, Construction and Interiors dreams to concrete reality

Here’s why you should partner with us to build your dream project:

We are new generation Design, construction and Interiors firm with competent and visionary engineers leading the way since 2014.

Our company has been an established Design, Consulting, Construction and Interiors firm, creating homes and offices in different locations. The expertise and experience we offer is based on the industry’s standards, all for a reasonably packaged price. As your trusted partner, we are assuring you of an excellent workmanship from start phase of the construction until the turnover of the project.

We are a team of competent construction engineers who will be your partner to build your property.  May it be construction of new home/office, reconstruction of an office building/home, we are dependable professionals who will render outstanding services from pre-construction to post-construction and cost scheduling, and our team will be ready to serve you.

Construction

Construction Packages

Segment E

Starting at Rs.1799/-

  • 2D Floor Plans
  • 3D Elevations
  • Structural Drawing
  • Electrical Drawing
  • Plumbing Drawing
  • Steel – Sunvik, Kamdhenu, A1, India Gold, VRKP, SK Or any Equivalent
  • Cement-Ramco/Priya/Maha/Coramandal/Pena/Dalmia/Chettinadu/Bharthi Or Equivalent (43 grade for block work and plastering & 53 Grade for all concrete work)
  • Aggregates – 20mm & 40mm
  • Blocks – Standard Solid Concrete Blocks. 6 Inch for external wall & 4 Inch for internal walls
  • M-Sand For Blockwork & P sand for Plastering
  • Waterproofing Component – DR. FIXIT/FOSROC/MYK Latricate/Weber
  • Foundation Depth 5 Feet From The Existing road/gound Level
  • Plinth Height – 1 Feet from The Existing ground Level
  • RCC Design Mix – M20 Or As Per The Structural Designer’s recommendation and shall be Ready mix/site mix
  • Ceiling Height – 10 Feet (Finished Floor Level To Finished Floor Level)
  • Parapet Wall Upto 3 feet height
  • Compound wall up to 3 feet height
  • Chicken Mesh For Masonry Joints
  • Underground Sump Of 7000L (Concrete Blocks)
  • External Chajja Upto 1 Feet Wide
  • Living, Kitchen, Dining, Bedrooms & Others – Vitrified of Choice of Upto Rs.60/- sqft
  • Staircase – Granite of Rs.100/- Sqft
  • Balcony & parking – Antiskid Tiles of Upto Rs.50/- sqft
  • Bathroom Walls – Tiles of Upto Rs.50/- sqft upto 7 Feet Height
  • Bathroom Floor- Antiskid Tiles of Upto Rs.50/- sqft
  • Kitchen Dado – 2 Feet height above counter top – Rs.50/- sqft
  • Kitchen Counter Slab – Granite of Rs.100/- sqft
  • Terrace – Cement screeding and finish
  • Percentage of opening for Doors & Windows – 10%-12% of built-up area maximum
  • Main Door – Teak finish Frame (5”X3”) With Veneer Finish Shutter and hard ware fitting worth ₹25000 including labor.
  • Room door frame and shutter – Sal Wood Frame With Membrane sutter, hardware and labor worth 8000/-
  • Puja Door – Teak finsh frame & membrane shutter including hardware Rs.15,000/- per Door
  • Bathroom Door – PVC Frame & shutter including hardware and labor – Rs.6,000/- per door
  • Aluminium 2 track windows – 5mm clear glass with MS Grills Basic price : Aluminium windows including MS grills – Rs 400/-
  • Internal wall & Ceiling – 2 Coats Of Putty + 1 Coat Of Primer & Painted With 2 Coats Of Asian Tractor Emulsion Or Equivalent
  • Exterior Painting – 1 Coat Primer + 2 Coats Of Ace Emulsion Or Equivalent
  • Enamel Paint For The Windows MS Grills
  • Wires(Fire resistant/Flame Retardant) – Copper wire – Anchor or Equivalent
  • Switches & Switch Board – Anchor/CONA/HIFI or equivalent
    DB’s and MCB’s Are Included
  • 1 UPS Point for each floor at the Nearest Feasible Point
  • Lift provision – Not included
  • Points Required For Interior Works Are Not Included
  • MS Gate – Upto Rs.400/- sqft
  • External Railings: Mild Steel- ₹ 250/Sq.Ft
  • Internal Railings: Mild Steel- ₹ 200/Sq.Ft
  • Cpvc Pipes: Ashirwad/Supreme/Astral or Equivalent
  • Pvc Overtank – Sintex/Ganga/Kaveri or Equivalent – 1000 Litres
  • Solar & Greyser Provision Lines Will Be Provided to Mixtures Only
  • Sewage Chambers With FRP/GI Cover Inside The Plot Area
  • Kitchen sink with accessories – SS (ISI Mark) Products Upto Rs.5,000/sqft
  • Branded Bathroom Sanitary Ware & Cp Fitting Upto Rs 20000/-,  Per 1000 Sqft (Bathroom Accessories: Ewc, Health Faucet, Wash Basin, Diverter & Overhead Shower)
  • .05% of budget
  • Soil Test
  • Earthing
  • BBMP/BDA Or Any Other Approvals from concerned authorities For Liaison Work
  • Compound and parapet Walls
  • Building plinth Level More Than 18-Inches Height From The Road Level
  • SSM work in case road is slope
  • Outside car Ramp
  • Extra Sump Depth in case for more water storage
  • Rain Water Harvesting
  • Sunken slabs
  • Internal and External Chejja
  • Pooja Room wall tiles and slab work
  • Elevation work
  • CCTV, Fibernet/Broadband, Interiors Electrical points
  • Any Interior Works Such As Wardrobe Or False Ceiling & Etc
  • External Cladding Work For Elevation
  • Extra Landscaping Work
  • Extra For Security grill Fabrication Works
  • Any Civil Works Outside House Area (outside Plinth)
  • Material Shifting Charges in case of small road which leads to storage problem and any such as per site condition and requirements that demands extra efforts and expenses
  • 2 No. Of Bathroom Will Be Provided For Each 1000 Sqft Of Construction. If Additional Bathroom Required Then, It Is Charged Based On Material & Labour Consumption
  • Electrical Fitting Such As Light Tubes/Bulbs, Fans Etc.,
  • Additional Charges Will Apply If Soil Bearing Capacity(Sbc)<180 which we get to know duing excavation work
  • Actual Built-up area/ Cost will be based on as per Site size.
  • Structure: The foundation shall be as per the structural drawings.
  • Water and electricity necessary for & during the period of construction shall be provided by the owner.
  • Cost has been arrived assuming natural earth in excavation. If any concrete structure, stone, rock slush or any other obstacle during the excavation which may require additional effort to dismantle or handle, would cost additional to this quote.
  • Handling of any unforeseen issues that arises with neighbors, statutory bodies during construction is the scope of the owner.
  • Any additional work which has not been included in the quote, will be taken up as per the listed price and applicable service charges.
  • No of Toilets considered is limited to 2 Nos & Kitchen/Utility is 1 No per 1000 Sft.
  • All statutory bodies like BBMP, BESCOM, BWSSB Including deposit & Bill Amount shall be the responsibility of the owner.
  • The payment shall be made as per the payment schedule in the Agreement.
  • The area of the building shall be measured from the outer to the outer edge of the roof slab for all the floors.
  • Plan sanction charges shall be borne by the owner.
  • Any alterations during the course of work, shall be borne by the owner.
  • The building structure would be under warranty for 10 years.
  • Age related cracks will not be covered under warranty, warranty invalid if alterations done.
  • For the validity of the Quotation, the Agreement to be signed within 30 days from the date of booking, if not the quote shall be null and void.
  • The packages of construction are calculated considering the base price of raw materials.
  • Price tolerance of 5% is factored in. Any increase or decrease would be borne by the respective parties.
  • The pricing and specifications are calculated considering a minimum built up area of 1000 sqft per floor.
  • Rates have been calculated considering the soil bearing capacity of minimum 180 kN/m2 and depth of foundation to be 5 Feet, rates could change as per the decrease in the SBC.
  • The site and the road level are considered same for calculations, any difference and backfilling would be at additional cost.
  • Extraordinary excavation conditions like rock or loose soil will attract additional cost.
  • Costs are calculated based on the assumption that space would be made available for labour shed and storage.
  • Any small quantity procurement will attract additional costs.
  • Rates are calculated for works under the slab; any additional work is at additional cost.
  • All materials rates includes transportation, loading and unloading charges
  • All laisoning fees and charges to the respective bodies to be borne by the client.

Segment S

Starting at Rs.1999/-

  • 2D Floor Plans with furniture layout
  • 3D floor plan views
  • 3D Elevations
  • Structural Drawing
  • Electrical Drawing
  • Plumbing Drawing
  • 3D Interiors design when project is turnkey
  • Steel – Sunvik, Kamdhenu, A1, India Gold, VRKP, SK Or any Equivalent
    Cement
  • Ramco/Priya/Maha/Coramandal/Pena/Dalmia/Chettinadu/Bharthi Or Equivalent (43 grade for block work and plastering & 53 Grade for all concrete work)
  • Aggregates – 20mm & 40mm
  • Blocks – Standard Solid Concrete Blocks. 6 Inch for external wall & 4 Inch for internal walls
  • M-Sand For Blockwork & P sand for Plastering
  • Waterproofing Component – DR. FIXIT/FOSROC/MYK Latricate/Weber
    Foundation Depth 5 Feet From The Existing road/gound Level
  • Plinth Height – 1.5 Feet from The Existing ground Level
  • RCC Design Mix – M20 Or As Per The Structural Designer’s Recommendation and shall be Ready mix/site mix
  • Ceiling Height – 10.5 Feet (Finished Floor Level To Finished Floor Level)
  • Parapet Wall Upto 3 feet height
  • Chicken Mesh For Masonry Joints
  • Underground Sump Of 8000L (Concrete Blocks)
  • External Chajja Upto 1 Feet Wide
  • Anti termite treatment
  • Two-Course Of Size Stone Masonry Under Plinth
  • Living, Kitchen, Dining, Bedrooms & Others – Vitrified of Choice of Upto Rs.90/- sqft
  • Staircase – Granite of Rs.120/- Sqft
  • Balcony & parking – Antiskid Tiles of Upto Rs.60/- sqft
  • Bathroom Walls – Tiles of Upto Rs.60/- sqft upto 7 Feet Height
  • Bathroom Floor- Antiskid Tiles of Upto Rs.50/- sqft
  • Kitchen Dado – 4 Feet height above counter top – Rs.70/- sqft
  • Kitchen Counter Slab – Granite of Rs.120/- sqft
  • Terrace – Cement screeding and finish
  • Percentage of opening for Doors & Windows – 12%-15% of built-up area maximum
  • Main Door – Teak finish Frame (5”X3”) With Veneer Finish Shutter and hard ware fitting worth ₹35000 including labor.
  • Room door frame and shutter – Sal Wood Frame With Membrane sutter, hardware and labor worth 10000/-
  • Puja Door – Teak finsh frame & membrane shutter including hardware Rs.20,000/- per Door
  • Bathroom Door – PVC Frame & shutter including hardware and labor – Rs.6,000/- per door
  • uPVC 2.5 track windows – 5mm clear glass with – 400/-
  • MS Grills of cost – Rs 200/-
  • Internal wall & Ceiling – 2 Coats Of Putty + 1 Coat Of Primer & Painted With 2 Coats Of Asian Tractor Emulsion Or Equivalent
  • Exterior Painting – 1 Coat Primer + 2 Coats Of Ace Emulsion Or Equivalent
  • Enamel Paint For The Windows MS Grills
  • Light & power points as per electrical design
  • AC and Geyser points included for 2 rooms
  • Wires (Fire resistant/Flame Retardant) – Copper wire – Anchor or Equivalent
  • Switches & Switch Board – Anchor/CONA/HIFI or equivalent
  • DB’s and MCB’s Are Included
  • UPS Provision – Included
  • CCTV – Provision included
  • Electric Car or Two Wheeler Charging Point Will Be Given In The Parking
  • Lift provision – Not included
  • Points Required For Interior Works Are Not Included
  • MS Gate – Upto Rs.400/- sqft
  • External Railings: Mild Steel- ₹ 250/Sq.Ft
  • Internal Railings: Mild Steel- ₹ 200/Sq.Ft
  • Indoor Staircase – SS Railing with glass Upto Rs.350/- sqft
  • Kitchen Utility Saftey Grills – MS Grill Upto 150 Sqft of Area
  • Cpvc Pipes: Ashirwad/Supreme/Astral or Equivalent
  • Pvc Over head tank – Sintex/Ganga/Kaveri or Equivalent – 1500 Litres
  • Solar & Greyser Provision Lines Will Be Provided to Mixtures Only
  • Internal & External Connection for water inlet from corporation
  • Sewage Chambers With FRP/GI Cover Inside The Plot Area
  • Kitchen sink with accessories – SS (ISI Mark) Products Upto Rs.8,000/sqft
  • Branded Bathroom Sanitary Ware & Cp Fitting Upto Rs 30000/- Per 1000 Sqft (Bathroom Accessories: Ewc, Health Faucet, Wash Basin, Diverter & Overhead Shower)
  • Rain Water harvesting
  • 0.1% of budget
  • Soil Test
  • Earthing
  • 10 Year Of Warranties on Structure
  • Fixture Warranties As Per Brand Makes
  • BBMP/BDA Or Any Other Approvals from concerned authorities For Liaison Work
  • Any work not mentioned within this package or outside the site
  • Compound Walls
  • Building plinth Level More Than 18″ Inches Height From The Road Level
  • SSM work in case road is slope
  • Outside car Ramp
  • Extra Sump Depth in case for more water storage
  • Sunken slabs
  • Internal Chejja
  • Pooja Room wall tiles and slab work
  • Elevation work
  • Any Interior Works Such As Wardrobe Or False Ceiling & Etc
  • External Cladding Work For Elevation
  • Extra Landscaping Work
  • Extra For Security grill Fabrication Works
  • Any Civil Works Outside House Area (outside Plinth)
  • Labor Shed
  • Water for construction
  • Temperory Electricity
  • Material Shifting Charges in case of small road which leads to storage Problem and any such as per site condition and requirements that demands extra efforts and expenses
  • 2 No. Of Bathroom Will Be Provided For Each 1000 Sqft Of Construction. If Additional Bathroom Required Then, It Is Charged Based On Material & Labour Consumption
  • Electrical Fitting Such As Light Tubes/Bulbs, Fans Etc.,
    Additional Charges Will Apply If Soil Bearing Capacity(Sbc)<180 which we get to know duing excavation work
  • Actual Built-up area/ Cost will be based on as per Site size. The area of the building shall be measured from the outer to the outer edge of the roof slab for all the floors.
  • Structure: The foundation shall be as per the structural drawings.
  • Water and electricity necessary for & during the period of construction shall be provided by the owner.
  • Cost has been arrived assuming natural earth in excavation. If any concrete structure, stone, rock slush or any other obstacle during the excavation which may require additional effort to dismantle or handle, would cost additional to this quote.
  • Handling of any unforeseen issues that arises with neighbors, statutory bodies during construction is the scope of the owner.
  • Any additional work which has not been included in the quote, will be taken up as per the listed price and applicable service charges.
  • No of Toilets considered is limited to 2 Nos & Kitchen/Utility is 1 No per 1000 Sft.
  • All statutory bodies like BBMP, BESCOM, BWSSB Including deposit & Bill Amount shall be the responsibility of the owner.
  • The payment shall be made as per the payment schedule in the Agreement.
  • Plan sanction charges shall be borne by the owner.
  • Any alterations during the course of work, shall be borne by the owner.
  • Age related cracks will not be covered under warranty, warranty invalid if alterations done.
  • For the validity of the Quotation, the Agreement to be signed within 30 days from the date of booking, if not the quote shall be null and void.
  • The packages of construction are calculated considering the base price of raw materials.
  • Price tolerance of 5% is factored in. Any increase or decrease would be borne by the respective parties.
  • The pricing and specifications are calculated considering a minimum built up area of 1000 sqft per floor.
  • Rates have been calculated considering the soil bearing capacity of minimum 180 kn/m2 and depth of foundation to be 5 Feet, rates could change as per the decrease in the SBC.
  • The site and the road level are considered same for calculations, any difference and backfilling would be at additional cost.
  • Extraordinary excavation conditions like rock or loose soil will attract additional cost.
  • Costs are calculated based on the assumption that space would be made available for labour shed and storage. Any small quantity procurement will attract additional costs.
  • Rates are calculated for works under the slab; any additional work is at additional cost.
  • All materials rates includes transportation, loading and unloading charges
  • All laisoning fees and charges to the respective bodies to be borne by the client.
  • The above mentioned material specifications are generalized, the inclusion or the exclusion of the same shall vary depending on the floor plan.

Segment P

Starting at Rs.2399/-

  • 2D Floor Plans with furniture layout
  • 3D floor plan views
  • 3D Exterior views
  • 3D Elevations
  • Structural Drawing
  • Electrical Drawing
  • Plumbing Drawing
  • 3D Interiors design when project is turnkey
  • Steel – Sunvik, Kamdhenu, A1, India Gold, VRKP, SK Or any Equivalent
  • Cement–Ramco/Priya/Maha/Coramandal/Pena/Dalmia/Chettinadu/Bharthi Or Equivalent (43 grade for block work and plastering & 53 Grade for all concrete work)
  • Aggregates – 20mm & 40mm
  • Lab tested Blocks – Standard Solid Concrete Blocks. 6 Inch for external wall & 4 Inch for internal walls
  • Lab Tested M-Sand For Blockwork & P sand for Plastering
  • Waterproofing Component – DR. FIXIT/FOSROC/MYK Latricate/Weber
  • Foundation Depth 5 Feet From The Existing road/gound Level
  • Plinth Height – 1.5 Feet from The Existing ground Level
  • RCC Design Mix – M20 Or As Per The Structural Designer’s Recommendation and shall be Ready mix/site mix
  • Ceiling Height – 11 Feet between flooring and roof
  • Parapet Wall Upto 3 feet height
  • Compound Wall up to 3feet height
  • Chicken Mesh For Masonry Joints
  • Underground Sump Of 10000L (Concrete Blocks)
  • External Chajja Upto 1 Feet Wide
  • Anti termite treatment
  • Two-Course Of Size Stone Masonry Under Plinth
  • Living, Kitchen, Dining, Bedrooms & Others – Vitrified of Choice of Upto Rs.120/- sqft
  • Staircase – Granite of Rs.140/- Sqft
  • Balcony & parking – Antiskid Tiles of Upto Rs.80/- sqft
  • Bathroom Walls – Tiles of Upto Rs.90/- sqft upto 7 Feet Height
  • Bathroom Floor- Antiskid Tiles of Upto Rs.75/- sqft
  • Kitchen Dado – 4 Feet height above counter top – Rs.70/- sqft
  • Kitchen Counter Slab – Granite of Rs.150/- sqft
  • Puja Room Wall – Tiles Upto Rs.60/- sqft upto 7 Feet of Height
  • Terrace – Cement screeding and finish
  • Main Door – Teak finish Frame (5”X3”) With Veneer Finish Shutter and hard ware fitting worth 50000 including labor.
  • Room door frame and shutter – Sal Wood Frame With Laminated sutter, hardware and labor worth 12000/-
  • Puja Door – Teak finsh frame & membrane shutter including hardware Rs.20,000/- per Door
  • Bathroom Door -WPC Frame & shutter including hardware and labor – Rs.10,000/- per door
  • uPVC 2.5 track windows – 5mm clear glass with – 550/- per sft
  • MS Grills of cost – Rs 200/- per sft
  • Internal wall & Ceiling – 2 Coats Of Putty + 1 Coat Of Primer & Painted With 2 Coats Of Asian Premium Emulsion Or Equivalent
  • Exterior Painting – 1 Coat Primer + 2 Coats Of Apex Emulsion Or Equivalent
  • Enamel Paint For The Windows MS Grills
  • Light & power points as per electrical design
  • Wires (Fire resistant/Flame Retardant) – Copper wire – Anchor or Equivalent
  • Switches & Switch Board – Anchor/CONA/HIFI or equivalent
  • DB’s and MCB’s Are Included
  • UPS Provision – Included
  • CCTV – Provision and cabling included
  • Electric Car or Two Wheeler Charging Point Will Be Given In The Parking
  • Lift provision – Not included
  • Points Required For Interior Works Are Not Included
  • Earthing and UG cable work included
  • MS Gate – Upto Rs.400/- sqft
  • External Railings: Mild Steel- ₹ 250/Sq.Ft
  • Internal Railings: Mild Steel- ₹ 250/Sq.Ft
  • Indoor Staircase – SS Railing with glass Upto Rs.350/- sqft
  • Kitchen Utility Saftey Grills – MS Grill Upto 200 Sqft of Area
  • Cpvc Pipes: Ashirwad/Supreme/Astral or Equivalent
  • Pvc Over head tank – Sintex/Ganga/Kaveri or Equivalent – 2000 Litres
  • Solar & Greyser Provision Lines Will Be Provided to Mixtures Only
  • Internal & External Connection for water inlet from corporation
  • Sewage Chambers With FRP/GI Cover Inside The Plot Area
  • Kitchen sink with accessories – SS (ISI Mark) Products Upto Rs.10,000/sqft
  • Branded Bathroom Sanitary Ware & Cp Fitting Upto Rs 50000/- Per 1000 Sqft (Bathroom Accessories: Ewc, Health Faucet, Wash Basin, Diverter & Overhead Shower)
  • Rain Water harvesting
  • 0.2% of budget
  • Soil Test
  • Earthing
  • 10 Year Of Warranties on Structure
  • Fixture Warranties As Per Brand Makes
  • BBMP/BDA Or Any Other Approvals from concerned authorities For Liaison Work
  • Any work not mentioned within this package or outside the site
  • Building plinth Level More Than 18″ Inches Height From The Road Level
  • SSM work in case road is slope
  • Outside car Ramp
  • Extra Sump Depth in case for more water storage
  • Internal Chejja
  • Elevation work
  • Any Interior Works Such As Wardrobe Or False Ceiling & Etc
  • External Cladding Work For Elevation
  • Extra Landscaping Work
  • Extra For Security grill Fabrication Works
  • Any Civil Works Outside House Area (outside Plinth)
  • Labor Shed
  • Water for construction
  • Temperory Electricity
  • Material Shifting Charges in case of small road which leads to storage Problem and any such as per site condition and requirements that demands extra efforts and expenses
  • 2 No. Of Bathroom Will Be Provided For Each 1000 Sqft Of Construction. If Additional Bathroom Required Then, It Is Charged Based On Material & Labour Consumption
  • Electrical Fitting Such As Light Tubes/Bulbs, Fans Etc.,
  • Additional Charges Will Apply If Soil Bearing Capacity(Sbc)<180 which we get to know duing excavation work
  • Actual Built-up area/ Cost will be based on as per Site size.
  • Structure: The foundation shall be as per the structural drawings.
  • Water and electricity necessary for & during the period of construction shall be provided by the owner.
  • Cost has been arrived assuming natural earth in excavation. If any concrete structure, stone, rock slush or any other obstacle during the excavation which may require additional effort to dismantle or handle, would cost additional to this quote.
  • Handling of any unforeseen issues that arises with neighbors, statutory bodies during construction is the scope of the owner.
  • Any additional work which has not been included in the quote, will be taken up as per the listed price and applicable service charges.
  • No of Toilets considered is limited to 2 Nos & Kitchen/Utility is 1 No per 1000 Sft.
  • All statutory bodies like BBMP, BESCOM, BWSSB Including deposit & Bill Amount shall be the responsibility of the owner.
  • The payment shall be made as per the payment schedule in the Agreement.
  • Plan sanction charges shall be borne by the owner.
  • Any alterations during the course of work, shall be borne by the owner.
  • Age related cracks will not be covered under warranty, warranty invalid if alterations done.
  • For the validity of the Quotation, the Agreement to be signed within 30 days from the date of booking, if not the quote shall be null and void.
  • The packages of construction are calculated considering the base price of raw materials.
  • Price tolerance of 5% is factored in. Any increase or decrease would be borne by the respective parties.
  • The pricing and specifications are calculated considering a minimum built up area of 1000 sqft per floor.
  • Rates have been calculated considering the soil bearing capacity of minimum 180 kn/m2 and depth of foundation to be 5 Feet, rates could change as per the decrease in the SBC.
  • The site and the road level are considered same for calculations, any difference and backfilling would be at additional cost.
  • Extraordinary excavation conditions like rock or loose soil will attract additional cost.
  • Costs are calculated based on the assumption that space would be made available for labour shed and storage. Any small quantity procurement will attract additional costs.
  • Rates are calculated for works under the slab; any additional work is at additional cost.
  • All materials rates includes transportation, loading and unloading charges
  • All laisoning fees and charges to the respective bodies to be borne by the client.
  • The above mentioned material specifications are generalized, the inclusion or the exclusion of the same shall vary depending on the floor plan.